Sunday, May 10, 2009

final site plan


the image above is a drawing of the final site plan, showing the proposed medians along Lee street and the paths which get you around and into the building

Lee street elevation




the image above is showing the Lee street elevation of the exterior.  This image also shows how the concept is applied, that was mentioned in the previous post.  With a more dense human scale as you would enter the building and a more sparse large scale as you move further away.

Studio Final team DF7A26-landscape

Below are the final renderings for the landscaping portion for team DF7A26.  The major concept guiding the design for the landscape was to take this enormous building down to human scale as you would approach and enter the building, to give time to take it all in as you would enter.  From the McCormick side of the building it is more open with larger plant life and becomes more dense and consists of smaller more human scale plant life as one would approach the entrance of the building.  At the entrance there are planters with seating and two rock garden areas as well.  There is also a water fountain located at the entrance next to one of the rock gardens to add variety of sound and texture, as well as a peaceful place to sit and relax among the business of Lee street.  The parking area located on the ground level can be accessed from McCormick , and is somewhat hidden behind a green screen wall.  The lines/voids that are in the green screen wall are an abstract graphic for replicating motion, as the train passes by.

Lee street median proposal

plan view of atrium entry

view from bus stop toward front entry

paths to atrium and Lee street

corner of McCormick and Lee street

Rock garden seating area

parking to left with green screen wall

detail of green screen design


view from Lee street